Project Chintan

India Approves Fourth Rail Line for Strategic 'Chicken's Neck' Corridor

India's Centre has approved a fourth railway line through the vital 'Chicken's Neck' corridor, a narrow land route connecting the Northeast to the rest of the country. The project aims to significantly enhance capacity and connectivity in the strategically important region.

· 2 min read
Updated

Key takeaways

  • A fourth railway line has been approved by the Indian Centre for the strategically important 'Chicken's Neck' corridor.
  • This corridor is essential for connecting the northeastern states with the rest of India and is vital for security and logistics.
  • The railway expansion aims to enhance capacity, improve passenger and freight traffic, and boost connectivity to remote areas.
  • Redevelopment of New Jalpaiguri station is progressing, with completion slated for April 2027.

The Indian government has sanctioned the construction of a fourth railway line through the strategically significant 'Chicken's Neck' corridor. This corridor, also known as the Siliguri Corridor, is a narrow land passage in North Bengal connecting India's northeastern states to the rest of the nation and is critical for both security and logistics.

What Happened

Northeast Frontier Railway General Manager Chetan Kumar Shrivastava announced the approval, stating that the decision moves beyond an earlier proposal for a third line to now include a fourth. He also noted an ongoing nearly 29-km double-line underground project between Tinmai Ghat and Bagdogra as another key infrastructure development. Shrivastava emphasized that the railways are prioritizing capacity enhancement in this corridor due to its strategic importance.

Key Facts

  • A fourth railway line has been approved through the 'Chicken's Neck' corridor by the Centre.
  • The Malda-New Jalpaiguri section is a crucial rail corridor connecting the Northeast with the rest of India.
  • A nearly 29-km double-line underground project between Tinmai Ghat and Bagdogra is also underway.
  • The 'Chicken's Neck' or Siliguri Corridor is a narrow land stretch in north Bengal, approximately 20-22 km wide and 60 km long.
  • Work on doubling the line in the Barsoi section is in progress.
  • New Jalpaiguri station's redevelopment is expected to be completed by April 2027.
  • 100 percent electrification of the NFR network has been completed.

Background

The 'Chicken's Neck' corridor is identified as a critical and sensitive lifeline for India. Shrivastava indicated that the completion of these projects will lead to a substantial transformation of the rail corridor, fostering more organized development in the area. Infrastructure expansion is also occurring across the Katihar division to manage increasing passenger and freight volumes. During the previous year, 42 new trains were introduced, and approximately 250 new stoppages were added.

What Happens Next

The approved projects are anticipated to significantly upgrade the rail corridor's capacity and efficiency. Plans are in motion to introduce new local train services from Jogbani, Radhikapur, and Balurghat, aimed at improving connectivity for residents in border and remote areas. Additionally, there are intentions to extend Vande Bharat train services beyond Guwahati to Tinsukia and Agartala, offering faster and more comfortable travel for passengers in the Northeast.

Sources reviewed

Project Chintan independently synthesized and analyzed information cross-checked across the sources listed above.

Related stories